LA CITY · NEWLY ISSUED PERMITS
Fresh permits.
Jobsites worth checking.
A research-ready shortlist of the 25 newly issued LA jobsites most worth checking for dumpster and roll-off work—ranked by project type, scope, size, and timing.
Buy today: email the order, receive an invoice, then get the files by email.
Public LA City data · Sample opens instantly · Seven-day first-purchase guarantee
A SHORTLIST, NOT A DATABASE DUMP
Twenty-five sites worth checking first.
We screen every eligible site, group related permits by property, and rank the strongest roll-off opportunities. Paid reports also include a searchable eligible-site inventory, sortable by ZIP with map links.
| Score | Why fit | Issued / age | Jobsite | Scope signals | Project |
|---|---|---|---|---|---|
| 80 | Demolition produces a concentrated debris load | Aug 128d lead age | 334 N Carmelina Ave90049 | Removal or demolition language signals haul-off debris · Earthwork or foundation scope can require heavy-debris handling | Demolition$20K · 2 permits |
| 100 | New construction produces ongoing debris and packaging | Aug 0614d lead age | 3608 S Centinela Ave90066 | Removal or demolition language signals haul-off debris · Earthwork or foundation scope can require heavy-debris handling | New Construction$4.0M · 3 permits |
| 86 | Addition work produces structural and finish debris | Jul 2823d lead age | 19454 W Wells Dr91356 | Removal or demolition language signals haul-off debris · Earthwork or foundation scope can require heavy-debris handling | Addition / ADU$450K · 3 permits |
| 64 | Alteration work commonly produces removal debris | Aug 0317d lead age | 700 World Way90045 | Removal or demolition language signals haul-off debris · Structural, concrete, framing, or roofing scope adds debris volume | Major Alteration$1.3M · 1 permits |
BUILT FOR ROLL-OFF SALES
Know which jobsites to check first.
This is not a homeowner quote list. It is a prospecting shortlist for roll-off operators who want actual newly issued projects without digging through a raw City portal.
Demolition & removal
Surface permitted demolition, removal, pool, remodel, and alteration work that can generate debris.
New builds & additions
Rank new construction, additions, ADUs, foundations, and multi-permit sites with longer service potential.
Prospecting & research
Sort by ZIP, open map links, review the work scope, and follow official permit links before assigning a rep.
THE FILTER
Public records, made operational.
- 1
Collect issued permits
Refresh the official LA City issued-permit feed—not completion or occupancy events—with a 30-day overlap so late-published records are not lost.
- 2
Group
Combine related permits by APN or normalized address into one jobsite opportunity.
- 3
Score roll-off fit
Score demolition, new construction, additions, removal language, project size, value, and multi-permit activity with deterministic rules.
- 4
Deliver the shortlist
Send the Top 25 plus the searchable eligible-site inventory after the weekly City refresh, normally Monday, with official LADBS links for independent contractor-of-record lookup.
START SMALL
Open the delayed Top 25. Buy the current list.
Start with the complete sample. To buy now, email your order, receive an invoice, and get the report files after payment.
TRY THE DATA
25-jobsite sample
$0
Open the delayed 25-jobsite Top 25, selected with the same deterministic scoring and selection algorithm as the paid shortlist.
Open the free sampleDownload the CSV insteadONE-TIME
Current roll-off shortlist
$29
25 ranked newly issued jobsites in CSV + HTML, plus a searchable eligible-site inventory of all 1,434 sites screened. Sort by ZIP and open map links for research.
Buy by invoiceFOUNDING PLAN · 10 SPOTS
Weekly roll-off shortlist
$49/month
The 25 best newly issued sites after the weekly City refresh, normally Monday, sortable by ZIP with map links, plus a searchable eligible-site inventory and four-week archive.
Reserve by invoiceFirst paid purchase covered by a seven-day refund guarantee. Weekly founding price is limited to the first ten customers and may be cancelled before the next invoice.
STRAIGHT ANSWERS
What this is—and is not.
Are these quote requests or exclusive leads?
No. These are prospecting opportunities built from public issued-permit records. The people behind the projects did not ask for quotes, and other people can access the underlying City data.
Do you include contact details?
No structured owner or contractor phone or email fields are included. Each row links to the official LADBS permit detail, where a contractor of record may be shown. A record may instead say owner-builder, and any license should be independently verified through CSLB.
Is this all of Los Angeles County?
No. Launch coverage is the City of Los Angeles only. The site does not claim countywide or statewide coverage.
Why does the issue date matter?
We use the permit's actual issue date from the City's issued-permit feed. An occupancy or completion date can surface a project months or years after the permit was issued, when roll-off demand may already have passed.
How fresh is the report?
The source is checked with a 30-day overlap. New records are delivered after the weekly City refresh, normally Monday; a late refresh delays delivery instead of producing a stale edition. Every report states the City source's own data-through date.
What files do I receive?
A Top 25 CSV and HTML shortlist, a searchable eligible-site inventory in CSV, and a manifest with source freshness, totals, and file checksums. The files are sortable by ZIP and include map links plus official LADBS permit-detail links.
How do I buy?
Use the invoice button, confirm the order by email, and we will send payment instructions. The report files are delivered by email after payment.
Can I cancel the weekly plan?
Yes. Email before the next monthly invoice. There is no annual contract.
SEE THE PRODUCT